LIUC

ARL - Archivio della Ricerca LIUC > Pubblicazioni della ricerca LIUC > Contributo in rivista

Please use this identifier to cite or link to this item: http://arl.liuc.it/dspace/handle/2468/4119

Title: Improving production planning through finite-capacity MRP
Authors: Rossi, Tommaso
Pozzi, Rossella
Pero, Margherita
Cigolini, Roberto
Issue Date: 2017
Abstract: Materials Requirement Planning (MRP) technique is widely employed by most manufacturing companies, even though field applications point out some weaknesses, including ignored production capacity constraints and fixed lead-times. These weaknesses often lead to infeasible production schedules, which trigger fluctuating workloads over time, significant adjustment effort and eventually unpredictably long lead times. This paper introduces a capacity-oriented MRP procedure that combines the traditional MRP procedure with an approach based on linear programming: in this way, requirement of lead times pre-determined a priori outside the MRP procedure is overcome. The new procedure is then applied to a real-life company and results highlight that feasible plans of orders are generated without requiring lead-times as input and without relevant computational burden.
URI: http://arl.liuc.it/dspace/handle/2468/4119
ISSN: 0020-7543
Appears in Collections:Contributo in rivista

Files in This Item:

File Description SizeFormat
4119.pdf681,95 kBAdobe PDFView/Open

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

 

Valid XHTML 1.0! DSpace Software Copyright © 2002-2010  Duraspace - Feedback